Construction Techniques and Methodology

How civil engineering works are actually built: the method step by step, the equipment in generic terms, the quality checks on site and safe site practice. Each lesson has an original sequence diagram, an illustrative worked calculation recomputed before publication, practice questions and official sources.

Progress: 4 of 61 planned lessons published in 18 chapters. Linked titles are published; the rest are the planned syllabus and will be linked as they are written.

Chapter 1: Site preparation and setting out

  1. 1.1 Site clearance, benchmarks and setting out of a building
  2. 1.2 Temporary facilities and access
  3. 1.3 Benchmarks and control points
  4. 1.4 Setting out of buildings and alignments

Chapter 2: Excavation, shoring and dewatering

  1. 2.1 Open excavation and safe slopes
  2. 2.2 Shoring systems: soldier piles, sheet piles, struts and anchors
  3. 2.3 Dewatering: sumps, wellpoints and deep wells

Chapter 3: Foundations and piling

  1. 3.1 Shallow foundations on site: PCC, footings and rafts
  2. 3.2 Bored cast-in-situ piles
  3. 3.3 Driven piles
  4. 3.4 Diaphragm walls
  5. 3.5 Pile testing and integrity checks on site

Chapter 4: Formwork and scaffolding

  1. 4.1 Conventional timber, plywood and steel formwork
  2. 4.2 Scaffolding and access systems
  3. 4.3 Slipform construction
  4. 4.4 Jumpform and climbing formwork
  5. 4.5 Striking formwork and back-propping

Chapter 5: Concrete production, placing, compaction and curing

  1. 5.1 Batching and mixing
  2. 5.2 Transporting and pumping concrete
  3. 5.3 Placing and compaction
  4. 5.4 Construction joints
  5. 5.5 Curing methods
  6. 5.6 Hot- and cold-weather concreting

Chapter 6: Reinforcement fixing

  1. 6.1 Cutting, bending and bar bending schedules on site
  2. 6.2 Placing, cover blocks, chairs and laps
  3. 6.3 Couplers and pre-pour checks

Chapter 7: Precast and prefabrication

  1. 7.1 Precast yards and casting
  2. 7.2 Handling, transport and erection of precast elements
  3. 7.3 Connections and joints in precast structures

Chapter 8: Steel erection

  1. 8.1 Fabrication, marking and trial assembly
  2. 8.2 Erection sequence, temporary bracing and alignment
  3. 8.3 Bolting and site welding checks

Chapter 9: Masonry

  1. 9.1 Brick and block masonry practice
  2. 9.2 Stone masonry practice

Chapter 10: Bridge construction methods

  1. 10.1 Cast-in-situ construction on staging
  2. 10.2 Balanced cantilever construction
  3. 10.3 Incremental launching
  4. 10.4 Precast segmental construction with launching gantry
  5. 10.5 Orthotropic steel deck erection

Chapter 11: Tunnelling

  1. 11.1 NATM (sequential excavation)
  2. 11.2 TBM tunnelling
  3. 11.3 Cut-and-cover construction

Chapter 12: Road and pavement construction

  1. 12.1 Embankment and subgrade construction
  2. 12.2 Granular layers and bituminous courses
  3. 12.3 Concrete pavements

Chapter 13: Waterproofing and finishes

  1. 13.1 Basement and roof waterproofing
  2. 13.2 Plastering, flooring and painting practice

Chapter 14: Quality control and testing on site

  1. 14.1 Site laboratory and material acceptance
  2. 14.2 Concrete testing on site
  3. 14.3 Inspection test plans and records

Chapter 15: Construction safety

  1. 15.1 Site safety planning and permits
  2. 15.2 Work at height, excavations and lifting operations

Chapter 16: Sequencing and method statements

  1. 16.1 Writing a method statement
  2. 16.2 Construction sequencing and temporary works

Chapter 17: Modern construction technology

  1. 17.1 BIM on site
  2. 17.2 Drones and modern survey
  3. 17.3 3D concrete printing
  4. 17.4 Modular and volumetric construction

Chapter 18: River and coastal protection

  1. 18.1 Articulated concrete block mattress (ACBM)
  2. 18.2 Tetrapods and concrete armour units
  3. 18.3 RCC porcupines

This lesson is for educational purposes only. Examples and numbers marked "illustrative" are not for design or construction. Standards are paraphrased and may be revised; refer to the current official edition from BIS, IRC or the relevant authority. Real work requires a qualified, licensed engineer, site-specific design, method statements and safety assessments. Indiacon does not rank codes, companies or countries and gives no investment advice. Follow the contract specification, the site-specific method statement, statutory safety rules and the instructions of a competent supervisor. Codes and specifications are cited by number and clause only; no text or tables are reproduced.

Text and diagrams are Indiacon originals. No brands or products are recommended. Author: Indiacon.

Suggest a correction

If something on this page is wrong, tell the editor. Your message is sent privately and is not published.

Sent privately to the Indiacon editor; not published.