Millau Viaduct

A multi-span cable-stayed motorway viaduct across the Tarn valley.

Project at a glance

LocationTarn valley near Millau, France
Owner / agencyCompagnie Eiffage du Viaduc de Millau (concession)
Completed / opened2004
SectorBridges
Length2,460 m
Height343 m
PiersSeven concrete piers
DeckSteel deck
MaterialsAbout 85,000 m³ of concrete and 36,000 t of structural steel

Construction technology used

  • Steel deck moved into place by incremental launching from both sides.
  • Multi-span cable-stayed deck on seven concrete piers.

Key facts

  • Built in three years (2001–2004); inaugurated on 14 December 2004.

Learn the engineering behind it

Sources

Facts on this page are taken only from official or authoritative sources (owner agencies, government releases, designers and contractors) and written in our own words. A figure is shown only when we could confirm it from at least two of the sources below; anything we could not confirm is left out. Spotted an error? Tell us.

Author: Indiacon. Last reviewed 24 Oct 2026. Educational summary; not an official project document.