2.1 Chain and tape surveying
After this lesson you should be able to:
- Reduce a measured slope length to the horizontal distance using the height difference or the slope angle.
- Apply the ordinary tape corrections for standardization, temperature, pull and sag, with the sign of each correction stated.
- Distinguish a chain from a steel tape in everyday field work, and know when stepping on a slope is a practical alternative to a calculated slope correction.
Theory
A distance on the ground is measured by stretching a chain or a steel tape along the line and counting the number of full lengths plus the residual. The quantity recorded in the field book is a measured length along the tape. The length required for mapping and setting-out is almost always the horizontal distance between the two points.
If the tape follows a uniform slope of length L and the difference of elevation between the ends is h, the horizontal distance is L_h = √(L² − h²), provided L > h. Equivalently, if the slope angle with the horizontal is θ, then L_h = L cos θ and the slope correction to be subtracted from L is C_slope = L − L_h = L (1 − cos θ). These two statements are the same geometry: sin θ = h/L. The correction is always subtractive on a slope, because the slope length is longer than the horizontal. On steep ground a practical alternative is stepping: short horizontal bays are measured with the tape held level, and the bays are added. Stepping does not need the slope formula, but it needs a careful level tape and short bays.
A steel tape is a measuring edge of known cross-section. Its true length changes with temperature, with the pull applied, and with sag if it hangs between supports. The corrections below are applied to the measured tape length first, to obtain the true length along the tape; the slope reduction, if needed, is then applied to that true length. A chain (commonly 20 m or 30 m in ordinary Indian field work, as described in the surveying textbooks already listed for this subject) is robust and convenient, but it is not treated as a precision measuring edge: temperature, pull and sag corrections of the kind used for a steel tape are not applied to a chain in this lesson.
Standardization. If a tape whose nominal length is L_0 has a true length L_true when it is compared with a reference, every measured length L_m taken with that tape is scaled: the true length along the tape is L_m × (L_true / L_0). Equivalently, the additive correction is C_std = L_m (L_true − L_0)/L_0. If the tape is too long (L_true > L_0), the recorded reading is too small and the correction is added. If the tape is too short, the correction is subtracted.
Temperature. For a linear coefficient of expansion α, a tape of length L standardized at temperature T_0 and used at temperature T has a correction C_t = α (T − T_0) L. The coefficient α is a property of the particular tape; values used in the examples are stated working values given with the problem, not official material constants. When T > T_0 the tape is longer than its standardized length, so C_t is added to the measured length. When T < T_0, C_t is subtracted.
Pull (tension). If the tape is standardized at a pull P_0 and is used at a pull P, Hooke’s law gives the change in length C_p = (P − P_0) L / (A E), where A is the cross-sectional area and E is the modulus of elasticity, both as stated for that tape. When P > P_0 the tape is stretched more than at standardization, so C_p is added.
Sag. When a tape hangs in a catenary between two supports at the same height, the surveyor measures along the curved tape but wants the straight (chord) distance between the supports. For a small sag the curve is close to a parabola: the mid-span sag is δ = w L² / (8 P) and the excess of arc over chord is C_sag = 8 δ² / (3 L) = w² L³ / (24 P²), where w is the weight of the tape per unit length and P is the pull. Equivalently, if W = w L is the total weight of that bay, C_sag = W² L / (24 P²). This correction is subtracted. The formula uses the span and the tape length as interchangeable because the sag is assumed small.
Derivation
- Slope. In the vertical plane through the line, the tape is the hypotenuse of a right triangle whose opposite side is the elevation difference h and whose adjacent side is the required horizontal distance. Pythagoras gives L_h = √(L² − h²), or L_h = L cos θ with sin θ = h/L. The quantity subtracted from the measured slope length is therefore L − L_h.
- Temperature and pull follow at once from the definitions. A uniform temperature change ΔT produces a proportional change of length α L ΔT. A change of axial force ΔP on a bar of area A and modulus E produces a change of length (ΔP / A) × (L / E) = (P − P_0) L / (A E).
- Sag, small-deflection parabola. Take the origin at mid-span, the chord along x, and the downward deflection y. For a uniformly loaded flexible tape with a nearly horizontal tension P, the moment balance on a half-span is P δ = (w L / 2) × (L / 4), so δ = w L² / (8 P). The parabola is y = δ [1 − (2x/L)²]. The arc-length element is ds = √(1 + y′²) dx. With y′ small, √(1 + y′²) ≈ 1 + y′² / 2, and integrating from −L/2 to L/2 gives an excess of arc over chord equal to 8 δ² / (3 L). Substituting δ produces w² L³ / (24 P²).
- Order of work. First obtain the true length along the tape by applying C_std, C_t, C_p and C_sag (each with its sign) to the measured length. Then, if the line is sloping, reduce that true length to the horizontal with √(L² − h²) or L cos θ.
Horizontal distance: L_h = √(L² − h²) (L > h), or L_h = L cos θ with sin θ = h/LSlope correction (always subtractive): C_slope = L − L_h = L (1 − cos θ)Standardization: true along tape = L_m × (L_true / L_0); C_std = L_m (L_true − L_0)/L_0 (add if the tape is too long)Temperature: C_t = α (T − T_0) L (add if T > T_0). α is a stated value for the tape in each problemPull: C_p = (P − P_0) L / (A E) (add if P > P_0). A in m², E in Pa, P in N, L in mSag (small sag, supports at the same height): C_sag = w² L³ / (24 P²) = W² L / (24 P²), subtract. Mid-span sag δ = w L² / (8 P)Order: correct the tape length first (standardization, temperature, pull, sag), then reduce for slope
- The slope is uniform between the two ends, or is treated as uniform in each bay that is reduced separately.
- Temperature is uniform along the tape. The coefficient α is constant over the temperature range of the problem.
- Pull is axial and uniform; A and E are constant along the tape and are the values stated in the problem.
- The sag formula is the small-deflection parabolic approximation, with supports at the same height and a small sag compared with the span.
- A chain is not given temperature, pull or sag corrections in this lesson.
- Examples use the stated working values given with each problem; they are not official material constants.
Codes and standards
Indian Standards are cited by number and clause only; no clause text, tables or figures are reproduced. Other standards are listed for comparison, not ranked.
- No Indian Standard clause is cited in this lesson. Official texts for metric surveying chains and for measuring tapes were not on the box at writing, so no standard numbers or clause numbers are used.
- The slope reduction is plane geometry. The temperature and pull corrections are the ordinary linear-expansion and Hooke’s-law statements. The sag correction is the small-deflection cable approximation derived above.
- Common field lengths (a 20 m or 30 m chain; a 30 m steel tape) and the distinction between a chain and a tape follow the surveying textbooks already listed for this subject (Duggal, Punmia, Ghilani). They are not quoted from a standard.
Worked examples
Problem. A 30 m steel tape, standardized at 20 °C, is used to measure a uniform slope. The recorded slope length is 30.000 m and the difference of elevation between the ends is 1.200 m. The field temperature is 42 °C. A stated coefficient α = 11.5 × 10⁻⁶ /°C is given for this tape. Find the true horizontal distance.
- Apply the temperature correction to the measured tape length first. C_t = α (T − T_0) L = (11.5 × 10⁻⁶) × (42 − 20) × 30.000 = (11.5 × 10⁻⁶) × 22 × 30 = 0.00759 m, added because the tape is warmer than the standardization temperature.
- The true length along the tape is 30.000 + 0.00759 = 30.00759 m.
- The horizontal distance is L_h = √(30.00759² − 1.200²) = √(900.4555 − 1.4400) = √899.0155 = 29.9836 m.
- If the slope reduction had been applied to 30.000 m before the temperature correction, the horizontal distance would have been 29.9760 m, and adding C_t afterwards would give 29.9836 m to this rounding — but the consistent order remains: correct the tape, then reduce for slope. On a longer line or a steeper slope the two orders can differ in the last place that is being kept.
Answer. True horizontal distance = 29.9836 m.
Problem. A 30 m steel tape is used on level ground between two supports 30 m apart (one bay). It was standardized at a pull P_0 = 50 N and is used at P = 80 N. The stated cross-section is A = 2.5 mm² = 2.5 × 10⁻⁶ m² and the stated modulus is E = 2.00 × 10¹¹ Pa. The stated weight of the tape is w = 0.15 N/m. The recorded length is 30.000 m. Find the true horizontal distance.
- Pull: C_p = (P − P_0) L / (A E) = (80 − 50) × 30 / (2.5 × 10⁻⁶ × 2.00 × 10¹¹) = 900 / (5.00 × 10⁵) = 0.001800 m, added because the field pull is larger than P_0.
- Sag: C_sag = w² L³ / (24 P²) = (0.15)² × 30³ / (24 × 80²) = 0.0225 × 27 000 / (24 × 6 400) = 607.5 / 153 600 = 0.003955 m, subtracted.
- The true length is 30.000 + 0.001800 − 0.003955 = 29.9978 m. Because the ground is level, this is also the horizontal distance.
- The mid-span sag is δ = w L² / (8 P) = 0.15 × 900 / 640 = 0.211 m, which is small compared with the 30 m span, so the parabolic approximation is in its intended range.
Answer. True horizontal distance = 29.9978 m.
Step-by-step procedure
- Range the line and mark the bays. On a long line, intermediate ranging rods keep the tape on the line.
- Record the measured length along the tape, the pull, the temperature, and (if the line slopes) the elevation difference or the slope angle of each bay.
- Apply C_std, C_t, C_p and C_sag to each bay, each with the sign derived above. Use the stated α, A, E and w for that tape; do not import a coefficient from another problem.
- Reduce the true tape length of each sloping bay to the horizontal with √(L² − h²) or L cos θ. Add the bays.
- On steep ground, consider stepping with a level tape in short horizontal bays instead of a long sloping measurement.
- For ordinary chain work, record the chainage and any offsets; do not apply steel-tape temperature, pull or sag corrections to a chain.
Site notes
- A steel tape used for setting-out should be compared with a reference (standardized) under a known pull and at a recorded temperature. The values of α, A, E and w used later must be those that belong to that tape.
- Supports at different heights, a tape dragging on the ground, or a poorly estimated pull, all take the sag formula outside the assumptions used above. If the tape is fully supported, the sag correction is not applied.
- Offsets to a detail point are measured from the chain line, usually at right angles. A right angle can be set out with a 3-4-5 triangle on the ground. Oblique offsets are usable if both the offset length and the chainage of the foot are recorded, but they are less convenient to plot.
- Wind, kinks and a tape that is not fully unrolled produce gross errors. These are not corrected by the formulae in this lesson; the line is remeasured.
- Reducing a slope length with L_h = L + h, or adding the slope correction instead of subtracting it.
- Applying the slope reduction to the uncorrected tape reading and then forgetting that C_t, C_p and C_sag belong to the tape length, or mixing the signs of those corrections.
- Using A in mm² in C_p = (P − P_0) L / (A E) without converting to m², or using E in GPa without converting to Pa, so that the units of C_p are wrong by a factor of 10⁶ or 10⁹.
- Taking C_sag as an addition, or using the total weight W in the w-form of the formula (or the reverse) without converting W = w L.
- Applying temperature, pull and sag corrections to a chain as if it were a standardized steel tape.
- Treating a stated working value of α or E as an official constant that can be reused on a different tape without being given.
L_h = √(L² − h²) = L cos θ. C_t = α (T − T_0) L, add if T > T_0. C_p = (P − P_0) L / (A E), add if P > P_0. C_sag = w² L³ / (24 P²), subtract. C_std = L_m (L_true − L_0)/L_0, add if the tape is too long. Correct the tape first, then reduce for slope. α, A, E and w are stated values for that tape.
Summary
- The field measurement is a length along the tape. Mapping and setting-out need the horizontal distance.
- On a uniform slope, L_h = √(L² − h²) = L cos θ, and the slope correction is subtractive.
- A steel tape is corrected for standardization, temperature, pull and sag, each with a definite sign, using the stated properties of that tape. A chain is not given those corrections in this lesson.
- Correct the tape length first, then reduce for slope. On steep ground, stepping with a level tape is a practical alternative to a long sloping measurement.
Practice questions
Tap a question to see the answer.
1A uniform slope measures 40.000 m along the tape. The difference of elevation between the ends is 2.500 m. Find the horizontal distance and the slope correction.
L_h = √(40.000² − 2.500²) = √(1 600 − 6.25) = √1 593.75 = 39.9218 m. C_slope = 40.000 − 39.9218 = 0.0782 m, subtracted from the slope length.
2A 30.000 m reading is taken on level ground with a steel tape standardized at 20 °C and used at 10 °C. A stated coefficient α = 11.5 × 10⁻⁶ /°C is given. Find C_t and the true length, ignoring pull and sag.
C_t = (11.5 × 10⁻⁶) × (10 − 20) × 30.000 = −0.00345 m (subtract, because the tape is colder than T_0). True length = 30.000 − 0.00345 = 29.99655 m.
3A 30 m tape, standardized at P_0 = 50 N, is used at P = 100 N on level, fully supported ground (no sag). The stated values are A = 3.0 × 10⁻⁶ m² and E = 2.00 × 10¹¹ Pa. The recorded length is 30.000 m. Find C_p and the true length.
C_p = (100 − 50) × 30 / (3.0 × 10⁻⁶ × 2.00 × 10¹¹) = 1 500 / (6.00 × 10⁵) = 0.00250 m, added. True length = 30.00250 m.
4A tape hangs between supports 30 m apart under a pull of 60 N. The stated weight is w = 0.12 N/m. Find the sag correction and the mid-span sag.
C_sag = (0.12)² × 30³ / (24 × 60²) = 0.0144 × 27 000 / (24 × 3 600) = 388.8 / 86 400 = 0.00450 m, subtracted from the measured tape length. δ = w L² / (8 P) = 0.12 × 900 / 480 = 0.225 m.
5A 30 m tape has a true length of 30.015 m when compared with a reference. A level line measures 150.000 m with this tape (five full tape lengths, no other corrections). Find the true length of the line.
True length = 150.000 × (30.015 / 30) = 150.075 m. Equivalently, C_std = 150.000 × (30.015 − 30)/30 = 0.075 m, added because the tape is too long.
6A recorded slope length of 30.000 m is taken at 42 °C with the same tape as Example 1 (α = 11.5 × 10⁻⁶ /°C, T_0 = 20 °C), and the elevation difference is 0.900 m. Find the true horizontal distance.
C_t = 0.00759 m as in Example 1, so the true tape length is 30.00759 m. L_h = √(30.00759² − 0.900²) = √(900.4555 − 0.8100) = √899.6455 = 29.9941 m.
References
Standard texts, listed in no order of merit. Our explanations, examples and diagrams are original; nothing is copied from these books.
- S. K. Duggal, Surveying, Vol. 1, McGraw Hill Education (India), 4th edition, 2013.
- B. C. Punmia, A. K. Jain, A. K. Jain, Surveying, Vol. 1, Laxmi Publications, 17th edition, 2016.
- C. D. Ghilani, Elementary Surveying: An Introduction to Geomatics, Pearson, 16th edition, 2022 (published 2021).
- The slope, temperature, pull and sag corrections are geometry, linear expansion, Hooke’s law and the small-sag cable approximation, as used in the lesson. Official texts for metric surveying chains and for measuring tapes were not on the box at writing, so no standard or clause numbers are used.