A construction contract decides who does what, who carries which risks and how payment is made. The main payment types differ in where the quantity and price risk sits.

In an item-rate or admeasurement contract, common in Indian public works, the contractor quotes a rate for each item in the bill of quantities; payment is the measured quantity times the rate, so the owner carries the quantity risk. In a lump-sum contract, the contractor agrees a fixed price for a defined scope; the contractor carries more risk and changes must go through variations. Cost-plus contracts reimburse actual cost plus a fee, useful when scope cannot be defined, but they need tight control. Target-cost contracts share savings and overruns.

Diagram: Indiacon original, not to scale.

Delivery models differ too. Design-bid-build separates design from construction. Design-build and EPC (engineering, procurement and construction) put both with the contractor. Public-private partnerships add finance and long-term operation.

Standard forms such as FIDIC, NEC4, AS 4000, CCDC 2 and the German VOB set out these rules; we describe them in our own words and do not rank them.

Whatever the type, the contract must be read as a whole: clauses on payment, variations, time and disputes work together.

Quick quiz

1Who carries quantity risk in an item-rate contract?

The owner.

2What does EPC combine?

Engineering, procurement and construction under one contractor.

3When is cost-plus useful?

When scope cannot be defined in advance.

Code note
  • FIDIC Conditions of Contract (Red, Yellow and Silver Books, 2017 editions) (International): Standard international contract forms for employer-designed, contractor-designed and turnkey works.
  • NEC4 Engineering and Construction Contract (UK): Contract suite built around collaboration and early warning.
  • AS 4000 (Australia): General conditions of contract for construction.
  • CCDC 2 (Canada): Stipulated price contract.
  • VOB (Parts A, B and C) (Germany): German construction contract procedures and general terms.

Cited by number and clause only. We do not reproduce clause text, tables or figures (BIS Act 2016, s.10(5) and s.11). Check the current edition and amendments before use.

References and further reading

Standard texts, listed in no order of merit. We do not copy text, figures, tables or solved problems from any book; our explanations and examples are original.

  • N. G. Bunni, The FIDIC Forms of Contract, Wiley-Blackwell, 3rd edition.
  • F. Harris, R. McCaffer, Modern Construction Management, Wiley-Blackwell, latest edition.

Free and official sources